Tasks / Product Craft

Build a roadmap

Can the model sequence bets against capacity and dependencies, and explain the order?

Task type v1.0 · 2 tasksLast changed 6 Oct 2026 · ChangelogDifficulty

What AI gets right here, and what you’ll still have to catch

From 16 graded outputs by 8 models. 69% were usable with at most a quick edit.

Reliably right

  1. Produces the required deliverable95% pass
    The roadmap is complete, in the right form for a Group PM, within the word limit, and actionable without major gaps.
    GPT-6.1 Sol · API · Fourteen requests from one customer
  2. Outcomes, with certainty that falls with distance94% pass
    Every item names its outcome (e.g., reduce paper transcription, reduce manual reconciliation), and near-term items are specific while later ones are deliberately looser (e.g., '7 weeks for rollout, workflow improvement and contingency').
    GPT-6.1 Sol · API · Fourteen requests from one customer
  3. Handles the big customer with evidence94% pass
    It uses Calder's rising usage and the second-hand 'might leave' to propose a conversation first, not committing the report builder, and offers a bounded export if needed.
    GPT-6.1 Sol · API · Fourteen requests from one customer

Where it slips

  1. Sees through the request count72% pass
    The output never counts requests by requester, does not mention that 14 requests come from Calder or that several are duplicates, and does not compare themes by customer count.
    GPT-6 Luna · API · Fourteen requests from one customer
  2. Uses the supplied evidence correctly72% pass
    States credit notes as 4 customers, but the request log contains 5 credit note tracking requests.
    Sonnet 5.5 · API · Fourteen requests from one customer
  3. Fits the stated capacity73% pass
    Q3 Expenses row lacks squad-week allocation, so the committed plan cannot be fully checked against the 11-week capacity.
    Opus 5.5 · Claude · A year of spend management, with a hard deadline

How it’s graded

Each check is built on how world-class product and growth leaders do this work, as they’ve described it on Lenny’s Podcast, and names the leader it comes from.

  1. Outcomes, with certainty that falls with distance

    Does each roadmap item say the problem or outcome it serves, and does precision (dates, scope) decrease for later items?

    Passes when Every item names its outcome or problem. Near-term items are specific and later ones are deliberately looser.

  2. Fits the stated capacity

    Does the committed plan fit the team capacity the brief gives, with sums a reader could check, and does it say what was cut or deferred to make it fit?

    Passes when The committed work adds up to no more than the stated capacity, with some slack, the sums can be checked, and it names what was cut or pushed later and why.

  3. Tells the story of the bets

    Does the roadmap group the work into a few themes and explain why those are the biggest things to invest in now, rather than presenting a scored or ranked list of projects?

    Passes when A handful of themes, each with the reason it matters most now, and the items sit under them.

Plus our standard checks

Uses the supplied evidence correctly · Addresses the actual decision · Respects explicit constraints · Identifies material uncertainty · Avoids unsupported claims · Produces the required deliverable · Sequences around dependencies · and 2 written for each task, which you’ll see in the tasks below.

The tasks

Read the brief, then compare up to three outputs, each with the LLM judge’s verdict on every check. Highlights mark what a PM had to fix.

The brief

You're the Group PM at Fernhill. Build the roadmap for the next half (Q1 and Q2) for our two squads, in no more than 900 words plus a table: what each squad builds, in what order, the outcome each item serves, what we're not doing and why, and what we tell Calder Group. The request log, usage, capacity and goal are attached.

What the model was given5 items: About Fernhill, company_goal_h1.md, feature_requests_last_6_months.csv, feature_usage.md, capacity_and_estimates.md
About FernhillPurchasing and inventory software for restaurants and hotels: orders, deliveries, invoices and stock.
company_goal_h1.md5 lines · Download
# Company goal for the half

Cut churn among independent restaurants (82% of accounts, 61% of revenue) from 2.4% to 1.6% a month. Top churn reason in exit surveys: "too much admin; didn't save us time on deliveries and invoices".

Calder Group renews in May. Their account manager says they "might" leave without the report builder; they haven't raised it with Customer Success, and their usage is up 20% this year.
feature_requests_last_6_months.csv53 rows · Download
request,requester,requester_arr_usd,source,title,theme
FR-300,Customer 553,4353,Support ticket,Credit note tracking,Invoicing
FR-301,Customer 391,9773,Sales call,Match invoices to deliveries automatically,Invoicing
FR-302,Customer 341,4856,Support ticket,Match invoices to deliveries automatically,Invoicing
FR-303,Calder Group,186000,Account manager,ERP export (CSV variant),Integrations
FR-304,Customer 895,9595,Sales call,Mobile receiving (check deliveries on a phone),Receiving
FR-305,Calder Group,186000,Account manager,Report builder with pivots,Reporting
…
feature_usage.md8 lines · Download
# Usage of related features today (last 30 days, 1,140 accounts)

| Feature | Accounts using it | Note |
|---|---|---|
| Standard reports | 212 (19%) | Calder Group uses them daily |
| Receiving checklist (desktop only) | 640 (56%) | 71% of uses start on a desktop, then get re-typed from paper |
| Invoice upload | 870 (76%) | Matching is manual |
…
capacity_and_estimates.md5 lines · Download
# Capacity, Q1 to Q2

Two squads, about 10 squad-weeks of roadmap work each per quarter (40 in total over the half).

Estimates (squad-weeks): Mobile receiving 8. Flag short deliveries 3 (needs mobile receiving). Invoice matching 9 (needs the new invoice parser, 5). Credit note tracking 3 (needs invoice matching). Accounting export with credits 2 (needs credit note tracking). Custom report builder 12. ERP export 4. Approval chains 6. Site-level permissions 4. SSO 3.
What a strong answer doesThe answer key the graders mark against

Builds the half around the churn goal (independent restaurants, whose top exit reason is admin around deliveries and invoices), not the request count. The log has 53 requests, but 14 come from one customer, Calder Group, and several of theirs are the same thing under different names (report builder three times, ERP export twice, bulk SKU twice, scheduled reports twice); across everyone else, receiving and invoicing requests dominate (mobile receiving 9, invoice matching 8, flag short deliveries 7, credit notes 5, accounting export 4). Sequences the dependency chain: mobile receiving (8), then flag short deliveries (3); the invoice parser (5), then invoice matching (9), then credit note tracking (3), then the accounting export (2): about 30 squad-weeks, inside the 40 available with slack. Handles Calder with evidence: their usage is up 20% and they haven't raised leaving with Customer Success, so talk to them before committing the 12-week report builder; offer a smaller item (SSO, 3, or the ERP export, 4) if it fits. Says what's not being done (report builder, approval chains, dark mode, multi-currency) and why, with near-term items specific and later ones looser.

Critical failures (cap the score at 40)
  • Schedules an item before the item it depends on (for example invoice matching before the parser)
Task

Staff-level · v1.0

The outputs

8 setups answered this brief.

Usable with a quick edit11 of 12 checks passed

The roadmap is complete, evidence-based, and directly usable; a PM could adopt it with minor wording tweaks and no re-checking of facts or logic.

Output

H1 roadmap

Priority: reduce admin that contributes to independent-restaurant churn. We’ll automate the invoice-to-credit workflow and make receiving work where deliveries happen. That addresses the stated churn reason and repeated requests across customers. Calder’s renewal matters, but the report-builder risk is unconfirmed, so we’ll validate it before committing 12 squad-weeks to a bespoke capability.

OrderSquad / timingWhat we buildOutcome served
1Squad A · Q1 (8 weeks)Mobile receivingLets staff check deliveries on a phone instead of re-typing paper checklists. Desktop-to-paper re-entry is a clear source of admin.
2Squad B · Q1 (5 weeks)Invoice parserPrerequisite for matching; prepares invoice data for automation.
3Squad B · Q1–Q2 (9 weeks total: 5 in Q1, 4 in Q2)Match invoices to deliveriesReduces manual reconciliation, directly addressing “too much admin”; invoice upload is already used by 76% of accounts. Starts after the parser.
4Squad A · Q2 (3 weeks)Flag short deliveriesSurfaces discrepancies at receiving, before they become invoice errors. Starts after mobile receiving.
5Squad B · Q2 (3 weeks)Credit note trackingExtends the automated invoice workflow to credits; starts after matching.
6Squad B · Q2 (2 weeks)Accounting export with creditsMakes the completed invoice-and-credit workflow easier to carry into accounting; starts after credit tracking.
—Squad A · Q1 (2 weeks); Squad A · Q2 (7 weeks)Field validation, rollout, adoption and measurement for the aboveValidate the receiving workflow with restaurants, help teams adopt it, and measure whether it reduces re-entry and invoice admin. Include direct Calder discovery in Q1.
—Squad B · Q2 (1 week)Hardening and release bufferProtects quality across the dependent invoice workflow before broad rollout.

This uses the 40 available squad-weeks: 20 per quarter. The invoice sequence is parser → matching → credit tracking → accounting export; receiving is mobile receiving → short-delivery flags.

Not doing this half

  • Custom report builder, dashboards and scheduled reports: 12 weeks, with the reported renewal risk coming from the account manager rather than Calder’s CS team; Calder’s usage is up 20% and it uses standard reports daily. We’ll validate the specific reporting job and whether it is truly a renewal blocker before reallocating capacity. A bespoke builder is not currently the best fit for the independent-restaurant churn goal.
  • ERP export, SSO, site permissions, approval chains, custom fields, catalogue work and other Calder requests: several are substantial or bespoke, and none has stronger evidence against the stated churn driver than the selected workflow improvements. We won’t imply these are committed.
  • More suppliers and dark mode: lower priority than reducing delivery and invoice admin.

What we tell Calder Group

“We’ve heard that reporting may affect your May renewal. We’re not committing to a custom report builder yet: your teams use standard reports daily, usage is growing, and we haven’t confirmed with you which reporting tasks are blocked. We’d like to meet with your reporting users and Customer Success early in Q1 to understand the must-have use cases and renewal criteria. We’ll come back with a clear proposal; meanwhile, we’ll be investing in reducing delivery and invoice admin across Fernhill.”

If that conversation confirms custom reporting is a hard renewal condition, we’ll bring the trade-off back for an explicit roadmap decision rather than promise a feature we haven’t scoped or prioritized.

Grades and run details

Decision model 92 · LLM judge 92
Decision model checks
  • passUses the supplied evidence correctly47%
  • passAddresses the actual decision95%
  • passRespects explicit constraints25%
  • passIdentifies material uncertainty98%
  • partialAvoids unsupported claims38%
  • passProduces the required deliverable58%
  • partialSees through the request count64%
  • passHandles the big customer with evidence97%
  • passOutcomes, with certainty that falls with distance67%
  • passFits the stated capacity15%
  • passSequences around dependencies88%
  • passTells the story of the bets87%
Run
Run
#1
API response time
58 s
Submitted
6 Oct 2026

Usable with a quick edit11 of 12 checks passed

The output is a complete, evidence-based roadmap with a clear story, actionable table and Calder plan. A PM could use it with light edits and no need to re-verify facts or restructure the reasoning.

Output

Fernhill roadmap, Q1 and Q2

The call: Both squads go to the company goal: deliveries and invoices, the top reasons independents give for leaving. Calder gets a bounded share of capacity, not the roadmap. Calder's report builder can't ship before May, so we tell them that directly and commit to a scoped plan.

Why this split: - The receiving and invoice chains (30 of 40 squad-weeks) serve 32 different non-Calder accounts. Mobile receiving and flagging short deliveries touch 16 accounts. Invoice matching, credit notes and the accounting export touch 16. - Calder has 14 of the 53 requests, but they come from one account. Every Calder-only item totals 29 squad-weeks (report builder, ERP export, site permissions, SSO, approval chains). Taking all of it would consume 73% of the half. - Usage backs the sequence. 56% of accounts use the receiving checklist, but 71% of uses start on a desktop and get re-typed from paper, so mobile receiving removes that step. Invoice matching is manual for the 76% of accounts that upload invoices.

Capacity: 2 squads × 10 squad-weeks per quarter. The plan uses 40 of 40, with a 1-week spike per squad left at the end of Q2 for report builder scoping.

OrderSquadItemWeeksTimingOutcome it servesNotes
11Mobile receiving8Q1 wk 1–8Less time per delivery; ends paper re-typing9 requests, 9 accounts
22Invoice parser5Q1 wk 1–5Prerequisite for invoice matchingOnly item with no visible customer output; it gates the invoice chain
32Invoice matching9Q1 wk 6–10 to Q2 wk 4Less manual invoice admin8 accounts; biggest admin saving
41Flag short deliveries3Q1 wk 9–10 to Q2 wk 1Catch shortages at the door, not on the invoiceNeeds item 1; 7 accounts
51ERP export (CSV/ERP format)4Q2 wk 2–5Calder renewal; integrationCalder only; ships before May renewal
62Credit note tracking3Q2 wk 5–7Credits matched to invoicesNeeds item 3; 4 accounts
72Accounting export with credits2Q2 wk 8–9Invoices and credits reach accounting without re-keyingNeeds item 6; 4 accounts
81Site-level permissions4Q2 wk 6–9Calder multi-site accessCalder only; see below
91 + 2Report builder scoping spike1 eachQ2 wk 10Scoped plan and H2 date for CalderDesign only, no build

Dependencies are the risk. Item 2 gates the invoice chain. If the parser slips, items 3, 6 and 7 slip with it, and the invoice outcome misses the half. I'd rather flag that now than hide it inside the plan. If the parser runs over, the first move is to pull the Calder-only site permissions work (item 8) back into the buffer.

Measures: Time per delivery receipt and percentage of invoices auto-matched, tracked per cohort. Independent-restaurant churn (2.4% → 1.6% a month) is the outcome. We won't claim the roadmap alone moves it.

What we're not doing, and why

  • Full custom report builder (12 weeks). It's 60% of one squad's half, for one account, and the earliest it ships is around the May renewal with no slack. We do a scoping spike and commit to a decision date, not a build date.
  • SSO (3) and approval chains with 5 levels (6). Calder only, and the 5-level approvals request is a niche configuration. H2 candidates, to be revisited with Calder.
  • Custom PDF invoices, custom order fields, per-site dashboards, bulk SKU import v2 and bulk SKU edit. All Calder-only, none estimated. Not in H1.
  • Dark mode (2 accounts), multi-currency (1 account), more suppliers (3 accounts). Low demand, no estimates. Parked, not rejected.
  • Scheduled reports by email (Calder, 2 requests). Not estimated. It goes into the spike as a candidate for a smaller Calder deliverable.

What we tell Calder Group

  1. Customer Success calls them this week, not the account manager alone. They haven't raised the report builder with CS, and "might leave" is the kind of risk that surfaces too late.
  2. Be direct about the report builder: it's a substantial build, it won't land before May, and we won't promise a date we can't keep.
  3. What they get in H1: the ERP export in the format they asked for, shipping around early May, and site-level permissions by the end of June.
  4. The report builder: we scope it with them in June, and we commit to an H2 decision date by the end of June. We don't commit to a build date until the spike returns.
  5. Ask them two things: which reports they run daily (we know they use standard reports), and what minimum output would cover them until the full builder ships. Their answer decides whether scheduled email reports move up.

Asks for leadership: confirm Calder's renewal status and ARR before the CS call, and approve the spike's two squad-weeks. If Calder won't engage on the scoped plan, we should know before the roadmap is shared externally.

Grades and run details

Decision model 79 · LLM judge 100
Decision model checks
  • failUses the supplied evidence correctly6%
  • passAddresses the actual decision95%
  • partialRespects explicit constraints23%
  • passIdentifies material uncertainty91%
  • partialAvoids unsupported claims56%
  • passProduces the required deliverable69%
  • passSees through the request count88%
  • passHandles the big customer with evidence95%
  • passOutcomes, with certainty that falls with distance80%
  • partialFits the stated capacity18%
  • passSequences around dependencies73%
  • passTells the story of the bets86%
Run
Run
#1
API response time
56 s
Submitted
8 Oct 2026

Needs more than a quick edit3 of 12 checks passed

The invoice matching estimate is incorrect, so the capacity plan is wrong and would need rework. A PM cannot use this without re-checking the evidence and recalculating.

Output

Fernhill H1 Product Roadmap (Q1–Q2)

Strategic Focus & Alignment

Our overriding company goal for H1 is to cut churn among independent restaurants (82% of accounts, 61% of revenue) from 2.4% to 1.6% a month. Exit surveys reveal the primary culprit: "too much admin; didn't save us time on deliveries and invoices."

Independent operators are drowning in manual paperwork at the back door and during invoice reconciliation. Therefore, both squads will be entirely laser-focused on automating receiving and invoice workflows in Q1 and Q2.

We have 40 total squad-weeks available (2 squads $\times$ 10 weeks per quarter). We are ruthlessly prioritizing features that directly target independent restaurant admin reduction, while deferring enterprise-heavy requests.

---

Squad 1: Receiving & Back-Door Ops

Squad 1 owns the physical receiving workflow, eliminating the friction of transcribing paper notes and catching vendor discrepancies at the door.

  • Q1 (Weeks 1–8): Mobile Receiving (8 squad-weeks)
  • Outcome: Enables staff to check deliveries directly on a phone or mobile device at the loading dock, eliminating the current clunky desktop-to-paper re-typing workflow used by 56% of accounts. Directly targets independent churn by saving hours of back-door admin.
  • Q1–Q2 (Overlap Weeks 9–10 & Q2 Weeks 1–3): Flag Short Deliveries at the Door (3 squad-weeks)
  • Outcome: Built immediately upon Mobile Receiving. Allows staff to instantly log missing or damaged items during the mobile check-in process, generating immediate vendor credit trails and saving reconciliation disputes.

---

Squad 2: Invoicing & Reconciliation

Squad 2 owns the financial workflow post-delivery, automating the tedious matching of paper/digital invoices against actual stock received.

  • Q1 (Weeks 1–9): Automated Invoice Matching (9 squad-weeks, including parser)
  • Outcome: Leverages the new invoice parser (5 weeks) alongside matching logic (4 weeks) to automatically reconcile uploaded invoices against verified deliveries. This attacks the second half of the independent churn bottleneck: manual invoice data entry.
  • Q2 (Weeks 1–4): Credit Note Tracking & Accounting Export (5 squad-weeks total)
  • Credit Note Tracking (3 wks): Tracks vendor credits resulting from short deliveries.
  • Accounting Export with Credits (2 wks): Seamlessly pushes reconciled invoices and credit notes to accounting software, removing end-of-month manual entry.

---

Roadmap Table

SquadQ1 InitiativeSquad-WeeksQ2 InitiativeSquad-WeeksPrimary Outcome
:---:---:---:---:---:---
Squad 1Mobile Receiving8Flag Short Deliveries3Eliminate paper re-typing at the back door; surface short deliveries instantly.
Squad 2Automated Invoice Matching9Credit Notes & Acct. Export5Automate invoice-to-delivery reconciliation and sync clean data to accounting.

---

What We Are Not Doing and Why

To hit our churn-reduction target, we are intentionally declining several high-visibility requests, notably from Calder Group (who accounts for $186k ARR, but whose account manager notes they "might" leave without the report builder).

1. Custom Report Builder (12 squad-weeks) & Calder’s Enterprise Requests (Approval chains, SSO, Site-level permissions, Custom PDF invoices): * Why: Building the Custom Report Builder would consume 30% of our entire company capacity for the half. While Calder Group represents significant ARR, their usage is actually up 20% this year, they have raised no complaints with Customer Success, and their renewal is in May. Diverting 12 weeks to appease an AM warning without CS validation while independent churn burns our revenue base is an unacceptable strategic risk. 2. More Suppliers / Catalogue Updates / Dark Mode / Multi-currency (FR-307, FR-315, FR-351, etc.): * Why: These are nice-to-haves that do not directly address the core operational admin burden cited in independent restaurant exit surveys.

---

What We Tell Calder Group

> "We value our partnership immensely and are thrilled to see your platform usage grow by 20% this year. For H1, our entire product and engineering organization is locked onto a company-wide mandate to eliminate back-office administrative overhead for operators—specifically delivering mobile receiving, short-delivery flagging, and automated invoice matching. > > Because these workflows directly accelerate daily operational efficiency, we aren't scheduling the Custom Report Builder or enterprise admin controls for Q1/Q2. However, your Account Manager and our Customer Success team are logging your specific reporting and export requirements so we can scope them for a future release cycle post-May renewal. We are fully committed to ensuring Fernhill continues to scale with Calder Group's operational needs."

Claims the judge couldn’t find in the brief

  • Automated Invoice Matching takes 9 squad-weeks including the parser (parser 5 weeks, matching logic 4 weeks).

Grades and run details

Decision model 79 · LLM judge 23
Decision model checks
  • passUses the supplied evidence correctly34%
  • passAddresses the actual decision32%
  • partialRespects explicit constraints9%
  • partialIdentifies material uncertainty28%
  • partialAvoids unsupported claims43%
  • passProduces the required deliverable26%
  • partialSees through the request count86%
  • passHandles the big customer with evidence37%
  • partialOutcomes, with certainty that falls with distance22%
  • passFits the stated capacity63%
  • passSequences around dependencies27%
  • passTells the story of the bets99%
Run
Run
#1
Time to output
6 s
Submitted
5 Oct 2026

Check by check

Where the outputs differ comes first. Open a check to read the judge’s reasons. “Mixed” means the two graders disagreed.

Where they differ 9

Uses the supplied evidence correctlyRightMixedMixed
GPT-6 Luna · API

All factual claims about the current situation are directly supported by the supplied context.

Haiku 5.5 · API

Every statement about the current situation can be traced to the supplied context or is derived by clear arithmetic from it, with no invented facts.

Gemini 3.5 Flash-Lite · Gemini

The output claims Automated Invoice Matching is 9 squad-weeks including the parser, but the supplied context indicates invoice matching is 9 weeks and the parser is a separate 5-week dependency, making the total 14.

Addresses the actual decisionRightRightMixed
GPT-6 Luna · API

Commits to a clear roadmap (receiving and invoicing automation) and says the Calder conversation would change the call if reporting is a hard renewal condition.

Haiku 5.5 · API

The roadmap commits unambiguously to investing in deliveries and invoices to address churn, with a clear call for Calder, and states what would change the plan (parser slippage).

Gemini 3.5 Flash-Lite · Gemini

The output does not state what result or condition would change the roadmap decision.

Identifies material uncertaintyRightRightWrong
GPT-6 Luna · API

Identifies the unconfirmed report-builder risk and states that a conversation with Calder will resolve it and could change the plan.

Haiku 5.5 · API

It names the key dependency risk (invoice parser slip) and how it would be resolved (pull site permissions), and acknowledges the roadmap alone won't guarantee the churn outcome.

Gemini 3.5 Flash-Lite · Gemini

The output does not name any unknowns that could change the decision or how they would be resolved.

Avoids unsupported claimsRightRightWrong
GPT-6 Luna · API

Interpretations like 'desktop-to-paper re-entry is a clear source of admin' are grounded in the usage data; no unsupported confident claims are made.

Haiku 5.5 · API

Interpretations and forecasts (e.g., why mobile receiving reduces admin) are clearly linked to the data, and no claim is presented as fact that isn't supported.

Gemini 3.5 Flash-Lite · Gemini

The output presents the invoice matching estimate (9 weeks including parser) as fact when the evidence does not support it.

Produces the required deliverableRightRightMixed
GPT-6 Luna · API

Provides a complete roadmap table with order, squad, timing, outcomes, a not-doing list with reasons, and a Calder message; a PM could act on it with light edits.

Haiku 5.5 · API

The roadmap includes a detailed table, explicit not-doing list, and a specific Calder communication plan, all usable by a Group PM as-is.

Gemini 3.5 Flash-Lite · Gemini

The capacity error makes the roadmap unusable without re-checking the evidence and redoing the capacity math.

Sees through the request countWrongRightWrong
GPT-6 Luna · API

The output never counts requests by requester, does not mention that 14 requests come from Calder or that several are duplicates, and does not compare themes by customer count.

Haiku 5.5 · API

It explicitly notes Calder's 14 requests come from a single account, de-duplicates themes, and weights demand by distinct customer count rather than raw request volume.

Gemini 3.5 Flash-Lite · Gemini

The output does not count requests by requester or de-duplicate Calder Group's multiple requests; it only notes Calder's requests are enterprise-heavy.

Handles the big customer with evidenceRightRightMixed
GPT-6 Luna · API

Uses Calder's rising usage and the second-hand 'might leave' to propose a discovery conversation instead of committing the report builder; no small item fits the full capacity, so omission is acceptable.

Haiku 5.5 · API

It uses Calder's rising usage and the second-hand 'might leave' to propose a direct CS conversation and a scoping spike, instead of committing the full report builder.

Gemini 3.5 Flash-Lite · Gemini

The output does not offer Calder Group a smaller item (like SSO or ERP export) to address their concerns, only defers everything.

Outcomes, with certainty that falls with distanceRightRightWrong
GPT-6 Luna · API

Every item names its outcome; near-term items are specific and later items (rollout, hardening) are deliberately looser.

Haiku 5.5 · API

Every roadmap item states the outcome or problem it serves; early items have precise timing, and the later report-builder spike is deliberately scoped rather than committed.

Gemini 3.5 Flash-Lite · Gemini

Q2 items are given specific week ranges (e.g., 'Q2 Weeks 1-4') rather than deliberately looser precision for later items.

Fits the stated capacityRightRightMixed
GPT-6 Luna · API

The committed work sums to 40 squad-weeks (30 for features + 9 for validation/rollout + 1 buffer), and the output names what was cut and why.

Haiku 5.5 · API

The committed work adds up to exactly 40 squad-weeks, the sums are verifiable, it names the items deferred (full report builder, SSO, approval chains, etc.), and includes a buffer/retreat plan.

Gemini 3.5 Flash-Lite · Gemini

The committed plan sums to 25 squad-weeks based on an incorrect estimate; the actual required work (parser 5 + matching 9 + credit notes 3 + export 2 + mobile 8 + flag 3) totals 30, and the output's capacity claim is therefore invalid.

All got right 3

Respects explicit constraintsRightRightRight
GPT-6 Luna · API

The output is under 900 words plus a table, includes the required sections, and addresses the Group PM reader.

Haiku 5.5 · API

The output is well under 900 words plus a table, includes the required elements (ordered items, outcomes, not-do list, Calder plan), and the proposed plan respects the squad and capacity limits.

Gemini 3.5 Flash-Lite · Gemini

The output is under 900 words, includes a table, and covers what each squad builds, order, outcomes, what's not being done, and what to tell Calder Group.

Sequences around dependenciesRightRightRight
GPT-6 Luna · API

All dependencies are respected (parser before matching, matching before credit notes, credit notes before accounting export, mobile receiving before flag short deliveries) and the chains are named.

Haiku 5.5 · API

All dependencies (flag short deliveries after mobile, invoice matching after parser, credit notes after matching, accounting export after credit notes) are respected and explicitly named.

Gemini 3.5 Flash-Lite · Gemini

The roadmap places flag short deliveries after mobile receiving, and the invoice matching item includes the parser, implying the parser is done first.

Tells the story of the betsRightRightRight
GPT-6 Luna · API

Groups work into two themes (invoice-to-credit automation and mobile receiving) tied directly to the churn reason.

Haiku 5.5 · API

The roadmap groups work into the themes of deliveries, invoices, and Calder retention, and explains why each is the most important investment now to cut churn and manage the renewal.

Gemini 3.5 Flash-Lite · Gemini

The work is grouped into two themes (Receiving & Back-Door Ops, Invoicing & Reconciliation) with clear reasons tied to the churn goal.

Results

Every setup we’ve tested on this task type, across all its tasks and repeats, graded on the current checklist. Calibrated. Where our PM checked the graders by hand, they agreed on 79% of 150 checks.

#Model · HarnessTask scoreDecision modelLLM judgeRunsCritical failures
1GPT-6.1 SolwithAPI100.096.42None
2GPT-6 AstrawithChatGPT93.9100.02None
3Opus 5.5withClaude90.296.42None
4Sonnet 5.5withAPI94.192.62None
5GPT-6 LunawithAPI92.085.42None
6Haiku 5.5withAPI74.296.42None
7Gemini 3.8 FlashwithAPI74.266.82None
8Gemini 3.5 Flash-LitewithGemini56.936.521 capped

What you get for the cost

No setup scores within 5 points of the leader at half its cost or less here, so the leader is also the best value.

Task score against relative cost for each setup. The table below has the same figures.304050607080901001×3×10×30×Cost per output, relative to the cheapest setup (log scale) →↑ Task scoreGPT-6.1 Sol · API: task score 98, 6.9× the cheapestGPT-6 Astra · ChatGPT: task score 97, 39× the cheapestOpus 5.5 · Claude: task score 94, 37× the cheapestSonnet 5.5 · API: task score 94, 36× the cheapestGPT-6 Luna · API: task score 87, the cheapestHaiku 5.5 · API: task score 86, 2.1× the cheapestGemini 3.8 Flash · API: task score 68, 5.5× the cheapestGemini 3.5 Flash-Lite · Gemini: task score 44, the cheapest, 1 critical failureGPT-6.1 Sol · APIGPT-6 Astra · ChatGPTOpus 5.5 · ClaudeSonnet 5.5 · APIGPT-6 Luna · APIHaiku 5.5 · APIGemini 3.8 Flash · APIGemini 3.5 Flash-Lite · Gemini
Nobody beats these on both score and costAt least one critical failure
Task score and relative cost by setup
SetupTask scoreRelative cost (cheapest = 1)
GPT-6 Luna · API871.0×
Gemini 3.5 Flash-Lite · Gemini441.1×
Haiku 5.5 · API862.1×
Gemini 3.8 Flash · API685.5×
GPT-6.1 Sol · API986.9×
Sonnet 5.5 · API9436×
Opus 5.5 · Claude9437×
GPT-6 Astra · ChatGPT9739×

Cost is each output’s tokens at the model’s list price, shown relative to the cheapest setup. Runs done in an app have no usage meter, so theirs are estimated from the same setup’s measured runs. How we compare cost

About the task

The PM job

Turning strategy into a sequenced plan.

Why it matters

A roadmap is where strategy meets capacity. Dated feature lists turn guesses into promises.

What good looks like

  • Items are problems or outcomes, not just features
  • Sequencing reflects dependencies
  • Explicit trade-offs
  • Commitment falls with distance

Deliberately not measured

  • Gantt formatting
Capability tested

Sequencing under constraints

The failure we’re looking for

A dated wishlist sorted by excitement

Grading

Decision model and LLM judge, calibrated against a blind PM review