What AI gets right here, and what you’ll still have to catch

From 14 graded outputs by 7 models. 36% were usable with at most a quick edit.

Reliably right

  1. Outcomes, with certainty that falls with distance95% pass
    Every item names the outcome or problem it serves; near-term items have specific targets (mid-December, January) while later items are looser (trigger-based, contract-dependent).
    Sonnet 5.5 · API · Two squads, eight asks, one half
  2. Sequences around dependencies89% pass
    Messaging service is built before SMS reminders and waitlist auto-fill, reminders before waitlist, and deposits are placed after the contract can be signed; the key dependencies are named.
    Sonnet 5.5 · API · Two squads, eight asks, one half
  3. Plans on the squads we actually have89% pass
    It explicitly excludes the two new squads from committed critical-path work and treats their capacity as upside after observed ramp.
    GPT-6 Astra · ChatGPT · A year of spend management, with a hard deadline

Where it slips

  1. Makes the call on procurement50% pass
    It correctly challenges the $6M claim but proposes only time-bounded validation without a threshold that would justify the full procurement build.
    GPT-6 Luna · API · A year of spend management, with a hard deadline
  2. Produces the required deliverable50% pass
    The roadmap and case are present, but the case is too long and the roadmap has capacity conflicts that would require major rework.
    GPT-6.1 Sol · API · A year of spend management, with a hard deadline
  3. Uses the supplied evidence correctly61% pass
    Most numbers and quotes are correct, but the output presents 'undermines booking reliability' as a current fact when the supplied context only says calendar sync failures cause 38% of support tickets.
    GPT-6 Astra · ChatGPT · Two squads, eight asks, one half

Case viewer

Read the brief, then put up to three outputs side by side, each with the LLM judge’s verdict on every check. Highlights mark what a PM had to fix.

The brief

You're a Staff PM at Harbor. Tom Achebe, our CEO, has shared his draft roadmap for the next four quarters (Q4 2026 to Q3 2027), and asked you to turn it into the roadmap we take to next week's planning offsite. The exec team (CEO, CFO, CRO and CTO) will read it beforehand. Write: 1. The roadmap itself, by quarter or by now, next and later: what each squad works on and the outcome each item serves. 2. The case for it, in no more than 1,200 words: why this order, what you changed from Tom's draft and why, what we're not doing, and the risks that could change the plan. The pack below is everything we have. Not all of it matters equally.

What the model was given12 items: About Harbor, FY27 goal (approved by the board, September 2026), Squads and capacity, Hiring, Card processor deadline, Candidate work (estimates in squad-weeks, by owning squad), Tom's draft roadmap, Procurement evidence, Card spend evidence, Multi-entity evidence, Integrations evidence, Other asks
About HarborSpend management (corporate cards, expenses and approvals) for companies with 200 to 2,000 employees. 1,100 customers, $86M ARR, average 700 employees per customer. 58% of revenue is interchange on card spend; the rest is subscription. Net revenue retention (NRR) is 104%.
FY27 goal (approved by the board, September 2026)Raise NRR to 112% by the end of Q3 2027 by expanding inside existing customers: more spend on Harbor cards, more entities and more modules. New-logo growth matters, but it comes second this year.
Squads and capacityFive squads: Cards, Expenses, Approvals & Policy, Integrations and Platform. After support and on-call, each has about 11 squad-weeks of roadmap capacity a quarter. Squads can take work from another squad's area, but it takes them about 1.5× as long.
HiringTwo new squads were approved in September 2026. Tom's draft counts the first from Q1 2027 and the second from Q2 2027, both at full capacity. Last year, our three approved squads took 5, 6 and 8 months from approval to their first full sprint, and each delivered about half its capacity in its first quarter.
Card processor deadlineOur card processor retires its v1 API on 31 March 2027. Every card authorisation we process runs through v1 today. Migrating to v2 is about 18 squad-weeks of Cards work, and the processor must then run 4 weeks of certification testing before we can cut over. Certification is the processor's time, not ours, but nothing can change on our side while it runs.
Candidate work (estimates in squad-weeks, by owning squad)1. Processor v2 migration: Cards 18. Hard deadline above. 2. Virtual cards for software subscriptions: Cards 10. Needs v2. 3. Real-time spend controls (declines out-of-policy spend at the point of sale): Cards 8, Approvals & Policy 4. Needs v2. 4. Procurement module (purchase requests and approvals, a new paid add-on): Approvals & Policy 30, Integrations 6. 5. Multi-entity support (subsidiaries under one parent account): Platform 12, Approvals & Policy 10. 6. Sage Intacct integration: Integrations 9. 7. Microsoft Dynamics integration: Integrations 12. 8. SSO and SCIM provisioning: Platform 5. 9. Receipt-matching improvements: Expenses 6. 10. Mobile app rewrite: Expenses 22.
Tom's draft roadmapQ4 2026: Cards: v2 migration. Approvals & Policy: multi-entity. Integrations: Intacct. Platform: multi-entity. Expenses: receipt matching. Q1 2027: Cards: finish migration, start virtual cards. New squad A: procurement module. Integrations: Dynamics. Platform: SSO and SCIM. Q2 2027: Cards: virtual cards, spend controls. New squad A: procurement launch. New squad B: mobile rewrite. Q3 2027: Cards: spend controls. Everyone else: procurement adoption, mobile launch. Tom's note: “Procurement is our path to 112%. I've told the board it can add $6M of ARR in its first year.”
Procurement evidenceSix design partners have used a prototype since June. Two said they would pay for it; the other four already use a dedicated procurement tool and said they'd need a reason to switch. Proposed price: $8 per user per month, for users who raise purchase requests. At our customers, about 10% of employees raise purchase requests.
Card spend evidenceIn QBRs with our 60 largest customers, 26 asked for virtual cards for software subscriptions, and 31 CFOs asked for real-time spend controls. Finance estimates our customers pay about $410M a year of software subscriptions on other cards or by invoice (extrapolated from the 60 QBR accounts). Our net interchange is 1.1% of card spend.
Multi-entity evidence14 of our 60 largest customers have asked for it. Between them they have 52 subsidiaries not on Harbor, and 9 of the 14 have said in writing they would add their subsidiaries once it exists. Customer Success sized it at $2.9M ARR if all 52 joined at their parents' pricing.
Integrations evidence17% of customers use Sage Intacct through a CSV export. Their gross revenue churn is 13% a year, against 7% for customers on our NetSuite integration. Intacct was cited in 31% of lost new-logo deals last year, Dynamics in 8%. 3% of customers use Dynamics.
Other asksCRO: “Five enterprise deals worth $1.2M of pipeline need SSO and SCIM, and 11 existing accounts have it on their security review list.” CTO: “The mobile app is on a framework version that loses support in late 2027, and I want the rewrite done before then.” Support: receipt auto-match is at 71%, and unmatched receipts are the most common expense ticket.
What a strong answer doesThe answer key the graders mark against

A four-quarter roadmap that protects the 31 March deadline: the migration build has to finish by about early March to leave 4 weeks of certification, which is roughly all of Cards' capacity for Q4 and most of Q1 (18 of about 18 squad-weeks available before certification). So it adds help or buffer (Platform or another squad at 1.5×, or cutting everything else from Cards) and moves virtual cards out of Q1: both v2 features start only after cut-over (virtual cards Q2, spend controls Q2–Q3). It treats the new squads as upside: on past hiring they arrive around February to April 2027 and deliver half capacity in their first quarter, so nothing committed depends on them before Q2–Q3. It makes a clear call on procurement: the $6M claim needs about 890 accounts (81% of customers) paying $6,720 a year each (70 requesters × $8 × 12), and only 2 of 6 design partners would pay, so it replaces the 30-week build with a cheap paid test with a threshold, and keeps Approvals & Policy on multi-entity and spend controls, which have stronger expansion evidence ($2.9M sized, 9 of 14 committed in writing; about $1.5M a year of interchange from moving a third of the $410M of subscriptions onto virtual cards). Intacct comes early for its churn; Dynamics later or cut; SSO and SCIM are small and justified; the mobile rewrite waits for a new squad, before the framework's support ends. It lists what changed from Tom's draft, what's not being done, and the risks (certification slipping, hiring slipping), with commitment falling with distance.

Critical failures (cap the score at 40)
  • Leaves the processor migration finishing too late for 4 weeks of certification before 31 March 2027, or schedules virtual cards or real-time spend controls before it
Case

Staff-level · v1.1 · synthetic · B2B SaaS, fintech, capacity, hard deadline, staff-level

The outputs

7 setups answered this brief. Pick up to three to read side by side.

Needs more than a quick edit5 of 12 checks passed

The output contains a factual error about multi-entity commitments (claiming 9 commitments cover all 52 subsidiaries) and lacks a clear procurement test threshold, so a PM would need to re-check evidence and redo that reasoning.

Output

Part 1: Product Roadmap (Q4 2026 – Q3 2027)

``` ==================================================================================================== SQUAD Q4 2026 Q1 2027 Q2 2027 Q3 2027 ==================================================================================================== Cards Processor v2 Migration Finish v2 (Wks 1-7) Virtual Cards for SaaS Real-Time Controls (11 wks) API Freeze/Cert (W8-11) (6 wks remaining) (Cards: 3 wks) Virtual Cards Prep Real-Time Controls Interchange Optimization (4 wks) (Cards: 5 wks) & Scaling (8 wks) ---------------------------------------------------------------------------------------------------- Platform Multi-Entity: Core Multi-Entity: Wrap-up Platform Scaling & Cross-Entity Reporting Data Architecture (1 wk) Org Hierarchies & Enterprise Admin (11 wks) SSO & SCIM (5 wks) (11 wks) (11 wks) Hardening (5 wks) ---------------------------------------------------------------------------------------------------- Approvals & Multi-Entity: Policy Multi-Entity: Release Real-Time Controls: Procurement Discovery Policy & Approval Routing (2 wks) Policy Engine (4 wks) & Scoping (MVP) (10 wks) A&P Rule Engine Complex Approval Rules (Approvals: 11 wks) Buffer (1 wk) Upgrades (9 wks) (7 wks) ---------------------------------------------------------------------------------------------------- Integrations Sage Intacct Native Sage Intacct GA (2 wks) MS Dynamics Integration MS Dynamics GA (3 wks) Integration MS Dynamics Integration (Integrations: 10 wks) ERP Webhooks & Custom (9 wks) + Buffer (2 wk) (Integrations: 2 wks) Sync (8 wks) ---------------------------------------------------------------------------------------------------- Expenses Receipt Auto-Match Mobile App Rewrite: Mobile App Rewrite: Mobile App GA & Optimization (6 wks) Phase 1 Core Workflows Phase 2 Parity/Release Expense Policy Polish Mobile Prep (5 wks) (11 wks) (11 wks) (11 wks) ---------------------------------------------------------------------------------------------------- New Squad A [Hiring / Onboarding] [Ramp / Training] Procurement Foundation Procurement Workflows (A&P Focus) (Ramped: ~5.5 wks) (Full capacity: 11 wks) ---------------------------------------------------------------------------------------------------- New Squad B [Hiring / Pipeline] [Hiring] [Onboarding / Ramp] Integrations / Core (Ecosystem Focus) (Ramped: ~5.5 wks) ==================================================================================================== ```

Squad-by-Squad Outcomes

  • Cards:
  • Processor v2 Migration: Protects 100% of Harbor’s card-authorisation volume ($49.9M existing ARR) against the hard 31 March 2027 processor shutoff; unlocks v2 capabilities required for virtual cards and real-time controls.
  • Virtual Cards for Software Subscriptions: Captures existing customer SaaS spend currently paid via invoice/other cards ($410M addressable pool), directly driving interchange revenue to expand NRR.
  • Real-Time Spend Controls: Enables 31 top-tier CFO accounts to enforce budgets at point-of-sale, unlocking enterprise card issuance and shifting unmanaged invoice spend to Harbor cards.
  • Platform:
  • Multi-Entity Architecture: Unlocks $2.9M contracted expansion ARR across 52 non-Harbor subsidiaries of top accounts.
  • SSO & SCIM Provisioning: Unblocks $1.2M in enterprise pipeline and closes compliance gaps for 11 critical renewal accounts.
  • Approvals & Policy:
  • Multi-Entity Approvals: Delivers cross-subsidiary approval chains required to close existing multi-entity commitments.
  • Real-Time Policy Engine: Co-delivers immediate POS budget validation with the Cards squad.
  • Procurement Discovery & MVP Architecture: Reframes procurement around verified buyer demand without starving committed delivery.
  • Integrations:
  • Sage Intacct Integration: Halves the 13% annual churn rate of the 17% of Harbor customers on Intacct (retaining ~$875k ARR annually) and addresses Harbor's #1 new-logo loss reason (31% of lost deals).
  • Microsoft Dynamics Integration: Expands ERP coverage for mid-market accounts, removing friction for 3% of existing customers and 8% of pipeline.
  • Expenses:
  • Receipt-Matching Improvements: Drives match rate above 71%, eliminating Harbor’s highest-volume support ticket category and improving user retention.
  • Mobile App Rewrite: Eliminates framework deprecation risk ahead of the late-2027 vendor cutoff without stealing capacity from revenue-generating squads.

---

Part 2: The Case for the Roadmap

Executive Summary

To achieve our board-approved target of 112% NRR by Q3 2027 ($86M ARR base expanding by ~$6.9M), Harbor must focus on the highest-probability, shortest-time-to-value expansion levers within our current 1,100 customers: multi-entity expansion ($2.9M ARR), capturing existing software spend via virtual cards ($1.3M–$2.2M ARR), and plugging Sage Intacct churn ($875k ARR retained).

Tom’s draft relied on an unbuilt Procurement module to generate $6M ARR in FY27. Ground-level capacity, vendor deadlines, and design partner data show that strategy carries severe revenue and operational risk. The proposed roadmap secures our existential card processor deadline, resolves major customer expansion requests, and establishes realistic hiring and product timelines.

---

What Changed from Tom’s Draft and Why

#### 1. Realignment on Procurement ($6M ARR Myth vs. Reality) * The Math: Harbor has 1,100 customers averaging 700 employees (770,000 total users). With 10% raising purchase requests (70 users/account) at $8/user/month ($96/year), an adopting customer generates $6,720 ARR. To generate $6M ARR, 893 out of 1,100 customers (81% of our entire base) would have to buy and deploy a v1 module in under 9 months. * The Customer Signal: 4 out of 6 design partners already use dedicated tools (e.g., Coupa, Zip) and explicitly stated they will not switch. Only 2 of 6 expressed willingness to pay. * The Decision: Procurement cannot carry our FY27 NRR goal. We have reallocated primary capacity to guaranteed expansion drivers (Multi-Entity and Virtual Cards), while initiating a structured discovery and phased MVP build with Squad A.

#### 2. Realistic Hiring Capacity * Tom’s Assumption: Squad A operates at 100% capacity in Q1 2027 (11 squad-weeks) and Squad B in Q2 2027 (11 squad-weeks). * Historical Reality: Approvals to first full sprint took 5–8 months historically, delivering ~50% capacity in quarter one. Squads approved in September 2026 will not reach operational productivity until late Q1 / early Q2 2027. * The Decision: No critical-path milestone or revenue target in Q4 or Q1 relies on unhired squads. Existing squads carry core commitments; Squad A ramps on Procurement foundations in Q2 (delivering ~5.5 squad-weeks) and reaches full delivery in Q3.

#### 3. Strict Compliance with the 31 March 2027 Processor Deadline * The Constraint: The v1 API deprecates on 31 March 2027. Migrating takes 18 squad-weeks plus a mandatory 4-week processor certification freeze during which our codebase cannot change. * Execution Window: The 4-week certification must run in March 2027. Cards code complete must occur by Week 7 of Q1 2027. * The Allocation: Cards dedicates all 11 squad-weeks in Q4 2026 and 7 squad-weeks in Q1 2027 (18 weeks total). During the 4-week March freeze, the Cards squad transitions to architectural prep for Virtual Cards, avoiding wasted idle time.

#### 4. Resequencing Multi-Entity, SSO/SCIM, and Sage Intacct * Multi-Entity (Platform + Approvals): Prioritised immediately in Q4. 14 of our 60 largest accounts requested this; 9 have signed written commitments to add 52 subsidiaries ($2.9M ARR). Shipping in early Q1 allows two full quarters of rollout and revenue recognition. * Sage Intacct (Integrations): 17% of our customers use Intacct via CSV, churning at 13% vs. NetSuite’s 7%. Cutting churn across these 187 accounts ($14.6M ARR base) saves ~$875k in ARR retention while eliminating our top sales loss reason (31% of lost deals). * SSO & SCIM (Platform): Sequenced for Q1 immediately following core Multi-Entity work. For a 5-week lift, this unlocks $1.2M in stalled enterprise pipeline and secures 11 major renewals.

---

How this Roadmap Hits 112% NRR

By the end of Q3 2027, this roadmap expands our $86M base by $7.0M+ in recurring expansion and retained ARR, exceeding the board's 112% target ($6.88M incremental):

InitiativeMechanismTarget ARR Impact
:---:---:---
Multi-Entity52 parent-account subsidiaries onboarding+$2.9M ARR
Virtual Cards (SaaS)Capturing 35% of $410M unmanaged SaaS spend @ 1.1% net interchange+$1.58M ARR
Real-Time Spend ControlsUnlocking enterprise card adoption across 31 QBR accounts+$0.80M ARR
Sage Intacct IntegrationEliminating 6% excess churn across 187 customer accounts+$0.88M ARR
SSO & SCIMEnterprise expansion & churn protection across 11 key accounts+$0.90M ARR
Total Net Expansion+$7.06M ARR (~112.2% NRR)

---

What We Are Not Doing (And Why)

  1. Not building Procurement as a hasty monolith in Q1: Building a broad module against negative design-partner feedback on an imaginary timeline would burn 36 squad-weeks with minimal revenue return. We are building the data model and workflows methodically using Squad A once ramped.
  2. Not assigning the Mobile Rewrite to an unhired squad: Tom assigned this 22-week project to Squad B in Q2. Squad B will not be staffed in time. Instead, the Expenses squad owns mobile: they finish Receipt Matching in Q4 (improving our #1 support issue) and execute the mobile rewrite across Q1 and Q2, completing it comfortably before late-2027 framework retirement.
  3. Not prioritising Microsoft Dynamics over Sage Intacct: Dynamics accounts for only 3% of our customer base and 8% of lost deals (vs. Intacct’s 17% base and 31% deal loss). Dynamics is scheduled for Q2 after Intacct is fully deployed.
  4. No cross-domain squad thrashing: Squads working out of domain suffer a 1.5× productivity penalty. We kept all squads focused within their domain expertise rather than forcing Expenses or Integrations to build Cards or Approvals features.

---

Risks and Mitigation Strategies

1. Card Processor Certification Delay: * Risk: Processor testing slips past 4 weeks, threatening the 31 March v1 shutoff. * Mitigation: We complete Harbor development by Week 7 of Q1 (mid-February), yielding a two-week safety buffer before the freeze. Cards works closely with processor engineers weekly starting in Q4. 2. Multi-Entity Delivery Bottlenecks: * Risk: Multi-Entity touches both Platform (12 wks) and Approvals & Policy (10 wks); cross-squad misalignment could delay Q1 rollout. * Mitigation: The technical spec and API contract between Platform and A&P will be finalized in Sprint 1 of Q4, enabling independent parallel development. 3. Hiring Lags for Squad A and B: * Risk: Talent acquisition takes longer than the historical 5–8 months. * Mitigation: The baseline revenue plan (Multi-Entity, Virtual Cards, Intacct, SSO) relies entirely on our five existing squads. Squad A’s onboarding pace dictates the launch timing of Procurement, not the attainment of our 112% NRR target.

Claims the judge couldn’t find in the brief

  • 14 of our 60 largest accounts requested multi-entity; 9 have signed written commitments to add 52 subsidiaries ($2.9M ARR).

Grades and run details

Decision model 58 · LLM judge 7 of 13 checks
Decision model checks
  • failUses the supplied evidence correctly62%
  • passAddresses the actual decision83%
  • partialRespects explicit constraints23%
  • passIdentifies material uncertainty36%
  • failAvoids unsupported claims33%
  • failProduces the required deliverable79%
  • passProtects the processor deadline32%
  • passPlans on the squads we actually have94%
  • partialMakes the call on procurement89%
  • passOutcomes, with certainty that falls with distance27%
  • failFits the stated capacity52%
  • passSequences around dependencies16%
Run
Run
#1
API response time
45 s
Submitted
1 Oct 2026

Check by check

Open a check to read the judge’s reasons. “Mixed” means the two graders disagreed.

Got wrong 3

Uses the supplied evidence correctlyWrong

Claim 4 states that 9 signed commitments cover all 52 subsidiaries, but the brief only says 9 of 14 committed to add their subsidiaries, without specifying how many subsidiaries those 9 have; the 52 total is across all 14. This invents a fact.

Avoids unsupported claimsWrong

It presents the $2.9M multi-entity expansion as 'contracted expansion ARR' when only 9 of 14 have committed in writing, and the 52 subsidiaries are not all covered by those commitments.

Makes the call on procurementWrong

It checks the $6M claim and commits Approvals & Policy to better-evidenced work, but the proposed 'Procurement Discovery & Scoping (MVP)' lacks a clear threshold or paid test that would justify the full build.

Mixed 4

Addresses the actual decisionMixed

The output does not state what result or condition would change the roadmap decision; it lists risks and mitigations but not how the plan would change if a risk materializes.

Identifies material uncertaintyMixed

It names risks but does not say how they would be resolved or what would change the call; mitigations are given, but no explicit condition that would alter the roadmap.

Produces the required deliverableMixed

The roadmap table and case are present, complete, and usable by the exec team with light edits.

Fits the stated capacityMixed

Committed work per squad per quarter adds up to ≤11 squad-weeks with some slack (e.g., Integrations Q1 uses only 4 weeks), and the case names what was deferred (procurement monolith, Dynamics priority).

Got right 5

Respects explicit constraintsRight

The output provides a roadmap by quarter with squad work and outcomes, and a case under 1,200 words covering changes, what's not being done, and risks, as requested.

Protects the processor deadlineRight

Migration build finishes by week 7 of Q1, leaving weeks 8-11 for certification before 31 March; virtual cards and spend controls start only after cut-over in Q2/Q3.

Plans on the squads we actually haveRight

New squads are planned with half capacity in their first quarter (Q2 for Squad A, Q3 for Squad B), consistent with 5-8 month hiring history, and no critical commitments depend on them earlier.

Outcomes, with certainty that falls with distanceRight

Every roadmap item names an outcome or problem; near-term items are specific (e.g., 'Processor v2 Migration (11 wks)') and later ones are deliberately looser ('Cross-Entity Reporting & Enterprise Admin').

Sequences around dependenciesRight

Virtual cards and spend controls are placed after v2 migration; multi-entity and SSO are sequenced logically; dependencies like 'needs v2' are named.

Results

Every setup we’ve tested on this task, across all cases and repeats, graded on the current checklist. Calibrated: the graders match our PM on 89% of checks.

#Model · HarnessTask scoreDecision modelLLM judgeRunsCritical failures
1Sonnet 5.5withAPI89.6100.02None
2GPT-6 AstrawithChatGPT91.787.52None
3GPT-6.1 SolwithAPI91.784.62None
4GPT-6 LunawithAPI85.076.32None
5Opus 5.5withClaude80.565.12None
6Gemini 3.8 FlashwithAPI70.151.92None
7Gemini 3.5 Flash-LitewithGemini28.48.322 capped

About the task

The PM job

Turning strategy into a sequenced plan.

Why it matters

A roadmap is where strategy meets capacity. Dated feature lists turn guesses into promises.

What good looks like

  • Items are problems or outcomes, not just features
  • Sequencing reflects dependencies
  • Explicit trade-offs
  • Commitment falls with distance

Deliberately not measured

  • Gantt formatting
Capability tested

Sequencing under constraints

The failure we’re looking for

A dated wishlist sorted by excitement

Grading

Decision model and LLM judge, calibrated against a blind PM review